homecontact
bar1
bar1
bar2
Menu

B&B Drilling

The mast before it was hydraulically raised.

 

1500-barrel mud system.

 

Driller's house mounted on substructure.

 

Top view of mud system.

 

The mast after it was hydraulically raised.

Triple hydraulic scoping mast.

bar3
bar4